Safe, Legal, On Time
St. Louis, MO Oversize Load Permit Services and Regulations
Mississippi crossing scope and MoDOT load analysis
Preparing Equipment Moves in St. Louis
St. Louis routes can involve a Mississippi River crossing or remain entirely on the Missouri side. We coordinate the MoDOT application with the load's actual axle configuration and route scope. Illinois authority and bridge-owner requirements must be identified when the approach crosses the state line, alongside city or county street permissions.
St. Louis Load Details to Provide
| Item | Requirement / Coordination |
|---|---|
| Equipment | Truck and trailer identifiers; load description and whether it can be reduced |
| Measurements | Loaded width, height, length, gross weight, individual axle weights and axle spacing |
| Trip | Origin and destination addresses, requested dates and the receiving entrance |
- Fully Compliant
- Superload Ready
- Route Surveys
- Escort Coordination
- Multi-State Routing
- Bridge Analysis
- Clear Pricing
St. Louis Permit Services
| Permit Service | What We Handle |
|---|---|
| MoDOT single-trip OSOW permits | Application preparation for the St. Louis movement and the applicable Missouri authority |
| Large-dimension feasibility review | Eligibility, configuration and supporting-document review for this MO load |
| Heavy-load bridge analysis | Coordinate protection and jurisdiction checks for the approach to St. Louis |
Not sure which permit you need?
Call us with your load information to get your Missouri permit started.
St. Louis Permit Fees and Processing
| Permit / Review | Published Fee / Processing Basis |
|---|---|
| Single-trip oversize | $15 |
| Large-dimension study | Over 16 ft wide or high, or 150 ft long: $250 feasibility charge in addition to applicable permit fee |
| Overweight through 160,000 lb | $15 plus $20 for each 10,000 lb of excess weight under the applicable schedule |
| Above 160,000 lb | Applicable weight fees plus bridge analysis: $425 up to 50 miles, $625 for 51–200, $925 over 200 |
St. Louis quotes include MoDOT's applicable feasibility or bridge-analysis charges when the reviewed load exceeds routine limits.
Let’s Get Your
Permit Quote Started
St. Louis Permit Information
| Item | Requirement / Coordination |
|---|---|
| State authority | MoDOT Motor Carrier Services |
| Application system | MoDOT electronic OSOW permitting |
| Configuration review | MoDOT's routine gross limits vary by axle layout and spacing |
| Local / interstate scope | County, city and adjoining-state authority must match the route actually used |
| Local approach | Check St. Louis city / county authority as applicable; Illinois route portions require separate permission. |
Need A Price For Your Move?
Call with your dimensions and route. We’ll handle the rest.
St. Louis Superload and Special Review
| Trigger / Category | Review Requirement |
|---|---|
| Beyond routine limits | Generally over 16 ft wide/high, 150 ft long or 160,000 lb gross requires additional review |
| Planning window | Allow at least two weeks for route evaluation of loads exceeding routine limits |
St. Louis Pilot-Car and Escort Requirements
| Load / Road Condition | Escort Requirement |
|---|---|
| Permit-specific assignments | MoDOT's regulation book and permit assign escorts by dimensions, route and load type |
| Nonroutine moves | Traffic-control, utilities and law-enforcement needs are determined during review |
Superload or Mega Load?
We coordinate bridge analysis and engineering review. Talk to a permit agent today.
St. Louis Travel Restrictions
| Restriction | Planning Requirement |
|---|---|
| Movement schedule | Use the permitted travel period, holiday restrictions and weather conditions |
| Route constraints | Observe structure-specific lane, speed and separation requirements |
| Delivery coordination | Check St. Louis city / county authority as applicable; Illinois route portions require separate permission. |
St. Louis Route Planning
| Route Element | Load-Specific Check |
|---|---|
| Corridors to evaluate | I-64, I-70 and I-55; planning references only, subject to permit approval |
| Structures and clearance | Check the actual bridges, underpasses, overhead facilities and axle-specific posted limits |
| Final access | Check St. Louis city / county authority as applicable; Illinois route portions require separate permission. |
| Dispatch check | Confirm authorized route, dates, receiving access and current closures before departure |
Select the bridge and approach together before fixing the route. A Missouri-issued permit does not settle Illinois continuation or local access on either riverbank.
Order Your St. Louis Permit
Let our team help you determine the permits and requirements for your oversize or overweight shipment.